Topic
Counting Brookline's homes
How many homes has Brookline been adding, of what kind, and what does the forecast assume?
About 105 net new homes a year since 2016, by the Town's own building permits, up from about 40 a year before, nearly all of them in apartment and condominium buildings, with assisted living counted separately. The forecast assumes the same pace and the same kinds of homes.
- Read one by one, Brookline's building permits add up to about 105 net new homes a year from 2016 to 2025, after demolitions and without assisted living, and about 41 a year from 2008 to 2015. The years swing widely, from 262 homes in 2022 to 24 in 2025.
- The assessors' rolls agree: about as many homes reach the roll as were permitted, a year or so later. The Census does not: it shows about 150 homes a year added from 2010 to 2020, when permits that could have been finished by then add up to about 350 in all.
- Since 2016, about half of net new homes were in rental apartment buildings and about a fifth were age-restricted. Houses barely added to the count: most new houses replaced old ones.
- The forecast adds about 105 homes a year, apartments and condominiums in their recent proportions, each adding about $585,000 of assessed value and 0.244 school children.
- The Town's list of projects (October 2026) holds about 1,650 net new homes. The base case's next ten years, about 1,430 homes, are about what the list gives when each project is weighted by how often projects at its stage have been built, with Chestnut Hill counted in full; the whole list, or projects not yet proposed, would be over and above it.
Five ways of counting
Each source answers a slightly different question.
| Source | What it counts | Period | Homes a year | Limits |
|---|---|---|---|---|
| Town building permits, read one by one for this project | Homes created less homes demolished, by the year the permit was issued | 2008 to 2025 | about 105 since 2016; about 41 in 2008 to 2015 | Dated when work was permitted, not finished; a few permits do not state how many homes |
| Brookline Assessors, yearly rolls | Housing units recorded on each property, each January 1 | January 2016 to January 2025 | about 120, once cleaned | Begins with the FY2017 roll. Before cleaning, hotel rooms and record corrections (homes entered for the first time in buildings that had long stood) count as added homes |
| Planning Department, building permits | Net new homes permitted | Calendar 2022 to 2024 | 166 (252, 190, 57) | Three years only, including the busiest in two decades |
| US Census, decennial count | Every housing unit, occupied or not | April 2010 to April 2020 | about 150 (26,448 to 27,961) | Only every ten years; does not match the permits (below) |
| Census Bureau, building permit survey | Homes in newly built buildings only | 2006 to 2019 | about 30 | Misses conversions and homes added inside existing buildings |
The permits. The Town's permit files from 2008 hold about 1,700 to 2,500 building permits a year. Every one that could create or remove a home was read and coded: homes created and demolished, the kind of building, and the project it belongs to, so a project with several permits counts once. Assisted living is kept separate, since it brings no school children. By the year each project's main permit was issued, net of demolitions and without assisted living:
| Year | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 |
|---|---|---|---|---|---|---|---|---|---|
| Net new homes | 81 | 16 | 3 | 30 | 55 | 19 | 49 | 72 | 28 |
| Year | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| Net new homes | 15 | 65 | 172 | 189 | 108 | 262 | 150 | 34 | 24 |
The step up from 2016 came with the large rental buildings approved under the state's comprehensive permit law (Chapter 40B). Assisted living adds about 150 more, nearly all of it Fisher Hill in 2022.
The Planning Department's 166. Its June 2026 development look-ahead counted 252, 190 and 57 net new homes in permits issued in 2022, 2023 and 2024, 499 in all, or 166 a year. The count here comes to 262, 150 and 34 for the same years, 446 in all. The differences most likely come from which permits are netted against the homes they replaced (one Housing Authority building's 115 senior apartments replaced 60 older ones) and from two 2024 permits that do not state their number of homes. Matching it exactly would take the Planning Department's project list. The three years are also unusual: 2022 was the busiest year in two decades.
The assessors' rolls. They need cleaning before they can be read as new homes. Their total rose 2,144 from January 2016 to January 2025, but much of that was records rather than building: hotel rooms recorded as homes, a condominium parking lot, and the first unit counts for several tax-exempt housing complexes that had stood for decades. Without those, and with assisted living counted separately, the rolls show 1,082 more homes, arriving unevenly. Of the projects permitted from 2016 to mid-2023, all but one show up on the rolls, a median of about ten months after the permit, and permits issued from 2015 to 2023 net 1,214 homes against 1,194 on the rolls, counting assisted living in both.
The Census. The two Census counts differ by about 1,500 homes, about 150 a year, but the permits that could have been finished by April 2020 add up to about 350, and the federal permit survey agrees. The gap most likely lies in how the two Censuses counted rather than in building nobody permitted. This site uses the Census only to compare Brookline with other towns, which only the Census allows; for Brookline's own record it uses the permits.
What kind of homes were added
Net new homes in permits issued from 2016 to 2025, without assisted living, with each demolition counted against the project that replaced it:
| Kind of home | Net new homes | Share |
|---|---|---|
| Rental apartment buildings, mostly approved under Chapter 40B | 538 | 51% |
| Age-restricted apartments | 214 | 20% |
| Condominiums and small multifamily buildings | 123 | 12% |
| Houses (single, two and three-family) | 129 | 12% |
| Conversions and accessory units | 45 | 4% |
| Total | 1,049 | |
| Assisted living, counted separately | 151 |
The houses include 44 townhouses that are part of a rental Chapter 40B development; without them, houses added about 85 homes in ten years.
Houses add value but barely add homes. Of the 264 new single-family houses permitted from 2008 to 2025, most replaced a house that was torn down. A house rebuilt as a house counts here, and in the forecast, as renovation; a house rebuilt as a two-family adds one home.
Homes still to come are harder to count. The Town's 2024 Housing Plan lists 1,221 homes approved since 2016 through Chapter 40B. As of February 2024, 396 were built, 473 under construction and 352 not yet started, and none of the not-yet-started projects had a large building permit by September 2026. Recent permits are few: 34 net new homes in 2024 and 24 in 2025, well under the forecast's about 105 a year. Since homes reach the roll about a year after their permits, the next two years will very likely fall short of that pace, and the permits for all construction point the same way for new growth (Navigating the next few years).
What each kind of home adds to the tax base
Each project permitted from 2015 to 2022 that added homes, followed onto the assessment rolls through FY2026: the increase in its assessed value on each roll after its permit, net of market change and in FY2026 dollars, counting increases only. That is how state new growth is measured, parcel by parcel against the year before; a demolition does not reduce it.
| Kind of home | Projects | Net new homes | Value added | Per net new home |
|---|---|---|---|---|
| Apartment buildings | 3 | 334 | $174M | about $521,000 |
| Condominiums and small multifamily buildings | 6 | 46 | $40M | about $864,000 |
| Conversions and accessory units | 36 | 50 | $80M | about $1.6 million |
| Houses that added a home | 73 | 116 | $447M | about $3.9 million |
| Age-restricted apartments | 2 | 112 | $16M | about $146,000 |
| Assisted living (Fisher Hill) | 1 | 151 | $74M | about $490,000 |
| All | 809 | $831M | about $1.0 million |
A house that adds a home carries the whole new building's value, which is why houses come to several million dollars per home added. Age-restricted homes add little: one of the two buildings measured is affordable senior housing and the other was not finished, and a third, a Housing Authority building, pays no tax. The apartment and condominium samples are small, and large buildings take two to four years to reach their full value on the roll, so these are best read as rounded figures.
What the forecast assumes
How many. The forecast keeps total residential new growth at its recent rate, about 0.84% of the levy a year. Since 2009 that rate has stayed between 0.74% and 1.02%, whether about 40 or about 180 homes a year were being built: when fewer homes are built, renovation fills in. Within that total, the forecast counts about 105 net new homes a year, the permits' pace since 2016, plus the 384 proposed at Chestnut Hill, about 30,700 homes in all by FY2040. The rest of residential new growth is renovation, including houses rebuilt as houses. The Forecast Explorer's New homes built setting tests fewer: half the expected new homes, which leaves $6.9 million less room in FY2040, or none at all, with renovation and commercial growth at their trend, $13.7 million less. That setting does not let renovation fill in for the missing homes, so it shows the most they could cost the budget.
What kind. The homes the forecast adds are apartments and condominiums, in their 2016 to 2025 proportions, about four to one. It does not forecast more age-restricted homes, and houses and conversions, which mostly rebuild homes that were already there, sit with renovation. Each forecast home adds about $585,000 of assessed value, rising with home values after FY2026, and brings 0.244 school-age children, from the per-bedroom rates in RKG Associates' fiscal study for the Town applied to the bedrooms of recent new homes. The Town's own count in ten buildings opened since 2015 is lower: about 0.21 a home, and about 0.13 in the five with the smallest homes.
What would change it. A different mix changes both sides of the budget. A family-sized home pays several times the tax of an apartment and brings more children. A zoning change that lets new houses go up on split lots, with nothing torn down, would add a kind of home Brookline has hardly built; testing it would mean counting what each new home replaces as well as what it adds.
What could be built in the next ten years
Where the list comes from. The Town's website shows every project that would add homes and is under construction, approved, in review or awaiting a zoning vote: the Chapter 40B page, the Site Plan Review and Major Impact Project Review pages, the Special Town Meeting warrant and the Building Department's permit portal. The list below was compiled from those pages on October 15, 2026. Net new homes are the homes a project builds less the homes it demolishes, where the Town states them; where it does not, nothing is subtracted. Town pages can lag events, so a project may have moved on since.
On that list are about 1,650 net new homes in 25 projects. Three of the four under construction are already on the January 2025 assessment roll, because the assessors record homes while a building is still going up: Eleven80 at 1180 Boylston Street (50), 45 Bartlett Crescent (24) and 603-619 Boylston Street (12). Those 86 homes belong to the record above, not to the years ahead. The rest fall into four groups.
Moving: about 350 homes. Under construction, or approved recently with no appeal pending.
| Project | Net new homes | Status on the Town's pages |
|---|---|---|
| 40 Kent Street / 40 Webster Place (small and micro units) | 116 | Approved July 2026 |
| Heath and Sheafe Streets | 103 | Approved June 2025; the abutters' appeal has been dropped |
| Brookline Housing Authority, Walnut-High phase 1 | 64 | Approved December 2024; start depends on state tax credits; finish planned July 2028 |
| 2 Clark Road (conversion) | 35 | Building permit applied for, August 2026 |
| Residences of South Brookline, final phase | 16 | Approved January 2025 |
| St. Paul Street / Sewall Avenue (condominiums) | 12 | Under construction |
| 264 Washington Street | 3 | Approved December 2024 |
| Total | 349 |
Approved, not started: about 350 homes. Most were approved under Chapter 40B between 2019 and 2023 and have no building permit yet.
| Project | Net new homes | Status on the Town's pages |
|---|---|---|
| 217 Kent Street | 77 | Approved; no building permit applied for |
| 83 Longwood Avenue | 64 | Approved February 2022; no building permit applied for |
| 1299 Beacon Street | 55 | Approved 2019; building permit deadline extended to February 2028 |
| 209 Harvard Street | 44 | Approved November 2023; permit extended to November 2028 |
| 845 Boylston Street | 40 | Approved March 2023; under appeal |
| JFK Place, 445 Harvard Street | 25 | Approved; permit deadline extended to March 2027 |
| 500 Harvard Street | 24 | Approved December 2022 after a state-mediated settlement |
| Brookline Housing Authority, Walnut-High phase 2 | 17 | Follows phase 1; timing not set |
| Total | 346 |
In review: about 490 homes. Proposals still before a Town board or Town Meeting.
| Project | Net new homes | Status on the Town's pages |
|---|---|---|
| 654-678 Brookline Avenue (micro units over shops) | 154 | Design review, first meeting July 2026 |
| The Coolidge, Waldo Street | 143 | On hold; the 40B version would be 299 homes |
| 26 Pleasant Street | 96 | Zoning overlay before the November 17, 2026 Special Town Meeting |
| Hampton Court, 1223 Beacon Street | 53 | On hold at the applicant's request (123 homes replacing 70) |
| 429 Harvard Street | 40 | Before the Zoning Board of Appeals |
| 31 Harvard Street | 1 | Before the Planning Board |
| Total | 487 |
Chestnut Hill Office Park: 384 homes. Special permit review has begun for the project the spring 2026 rezoning was written for: 384 homes, a 187-room hotel, shops and medical offices.
What the base case already counts
Over the ten years 2027 to 2036, the first ten after the Comprehensive Plan's expected adoption, the base case adds about 1,430 homes: about 105 a year, the permits' pace since 2016, plus all 384 at Chestnut Hill. Of the 1,049 net new homes permitted from 2016 to 2025, 853 were in projects of ten or more homes and 196 in small projects (houses, conversions, small buildings). Carried forward, that is about 850 homes from larger projects over ten years, about 200 from small ones, and Chestnut Hill on top.
The base case adds about 105 homes a year, and Chestnut Hill on top
Net new homes finished each year, 2027 to 2036. The steady part is the pace of Brookline’s building permits from 2016 to 2025, split between larger and small projects as those permits were. Chestnut Hill’s 384 homes come in 2030 to 2032. About 1,430 homes in all.
Set against the list. Weighting each project by how often projects at its stage have been built gives about 1,400 homes, within about 35 of the base case.
Weighted by how often projects get built, the list gives about what the base case assumes
Net new homes finished 2027 to 2036. Each group’s homes on the Town’s list (October 2026) times the share likely built: 69% for approved projects is how Chapter 40B approvals from 2014 to 2023 turned out; 95% and 50% are judgments. Chestnut Hill is counted in full, as the base case counts it. Small projects are not on the list and come in at their 2016–2025 pace.
The weight for projects approved but not started comes from the record. Of the 1,221 homes approved under Chapter 40B from 2014 to 2023, listed in the Town's 2024 Housing Plan, 845 (69%) have since been built, a median of four and a half years after approval. That may be generous for today's group: none of the eight private 40B projects approved since 2019 has been built, and they make up most of it. Net new homes permitted fell to 34 in 2024 and 24 in 2025. Projects in review are weighted at half and projects already moving at 95%, both judgments. A project in review today would likely finish around 2030 or later, still inside the ten years.
Chestnut Hill is counted in full, as the base case counts it, though its special permit is still in review: the spring 2026 rezoning was written for this project, and review has begun. It is the largest single assumption in the count. Weighted at half, like the other projects in review, the expected count would be about 1,200.
What would be over and above it
- The rest of the list. If every project on it were built, about 330 more homes than the base case counts, for about 1,750 in ten years.
- Bigger versions of listed projects. The Coolidge's 40B version would add 156 homes over the version on the list.
- Projects not on the list. A separate Chapter 40B eligibility letter at Chestnut Hill covers 784 homes (540, plus 244 for residents 55 and over); so far it is only that letter. The Town is studying its own land at Fisher Hill West and the Centre Street lots, with no home counts yet. And projects proposed in the next few years can still be finished by 2036.
The base case's pace sits within what the list supports. The years will not be even: with only the 12 homes at St. Paul Street and Sewall Avenue still to come from buildings under construction, the next two or three years should run below about 105 a year, and the years after that above it if the approved projects get built. The signs to watch are building permits for the approved 40B projects, each fall's permit count, and the homes on each January's assessment roll.
Which figure the site uses where
- about 105 a year is the forecast's pace and the permits' since 2016.
- about 1,250 homes is what the permits added from FY2011 to FY2025, used when comparing homes with Town staffing.
- 166 a year is the Planning Department's count for 2022 to 2024, cited only as theirs.
- About 150 a year is the Census decade, used only for comparisons with other towns.
Go deeper
- New homes and the budget: is there room?: When Brookline adds homes, does the budget follow, does the Town have room for them, and what would show that it needs more?
- New homes and Brookline's budget: What does a new home cost the Town, now that enrollment is falling?
- Growth: when a new home pays for itself: When does a new home, or new commercial space, add more tax than it costs the Town?
- Growth: renovation and what faster growth is worth: Where does Brookline's new growth come from, and what would faster growth be worth?
- Enrollment: three forecasts compared: Why do the enrollment forecasts disagree, and which one does the base case use?
Last updated 2026-10-31. What has changed.